4.8 rating
4.8 rating
Engineering Innovation & Digitalization for Smarter Operations
Driving growth and efficiency across industries with advanced engineering and digital solutions.
Our Clients
clients
Comprehensive Engineering Services for Industries
Our Services
Three Phase Tech Services provides a wide range of engineering solutions designed to improve efficiency, simplify operations, and support long-term growth for companies in diverse sectors.
Digital Solutions for Monitoring, Savings, and Operational Excellence
Our Solutions
Partnerships | Certificates | Recognitions
Reliable Partner
Partner
Partner
SPIRE Qualified Company
Education Partner
Academic Partner
Country Winner 2024-2025
Certificate of Appreciation
Certificate of Appreciation
Certificate of Recognition
Best EcoXpert Services Partner Award
Industrial Efficiency with Advanced Monitoring and Technical Analysis
Streamlined Operations
Customized Engineering
Ongoing Optimization
Technological Integration
Proactive Management
Scalability
Proactive Management
Technological Integration
Insights & Updates
Blogs & Articles
Transformer Oil Testing Procedures and Acceptance Standards in UAE
What’s New : DEWA updated transformer maintenance standards in late 2024, requiring annual dissolved gas analysis (DGA) for all distribution transformers above 1,000 kVA and biannual testing for critical facility transformers.…
What Is the Difference Between Soft Starter and VFD for Motor Control
What’s New in Motor Control Technology (2026): DEWA energy efficiency standards updated in late 2024, mandating variable frequency drives for HVAC systems above 7.5 kW and pump applications above 15…
How to Calculate Cable Size for Three Phase Motors in Industrial Plants
What’s New: ESMA introduced revised electrical installation standards in late 2024, requiring enhanced documentation for cable sizing calculations on motor installations above 10 kW. DEWA updated technical specifications mandating voltage…
Industrial Generator Sizing Calculator for Manufacturing Facilities
What’s New : DEWA updated backup power requirements in late 2024, mandating detailed load calculations for generators above 500 kVA. ESMA introduced generator efficiency standards requiring fuel consumption documentation and…
How to Perform Load Flow Analysis for Industrial Power Distribution Systems
What’s New in Load Flow Analysis (2026): DEWA updated electrical design standards in late 2024, requiring load flow analysis documentation for industrial facilities above 1,000 kVA. Studies must demonstrate voltage…
Guide on Power Factor Correction Equipment Selection for Gulf Manufacturing Plants
What’s New in Power Factor Correction (2026): DEWA revised power factor penalty structures in late 2024, increasing charges for industrial facilities operating below 0.92 power factor. Penalties now reach AED…